When a cattle grid fails, it’s seldom the steel’s fault. More often the grid was rated for the farm ute rather than the grain truck, it’s too narrow for the machinery crossing it, the abutments were set on badly prepared ground, or it’s simply reached the end of its working life.
Rate the grid for the heaviest axle group that will ever cross itHeavy-duty cattle grids in Australia are designed to AS 5100.2 (Bridge design), the same loading standard used for road bridges. Grid ratings are given as an axle load, meaning what matters is the heaviest axle group that will cross the grid, not the gross weight of the vehicle or how often it visits.
This is where most under-specified grids come from. A homestead entry might carry nothing heavier than a ute for most of the year, but the same crossing takes the fuel tanker, the stock carrier at weaning, the concrete agitator when a shed goes in, and grain trucks at harvest.
The question to ask is: what is the heaviest axle group likely to use this grid? As a starting point:
- Single axle group or below, light vehicles only: 8T cattle grid. Suitable only where you are confident trucks will never use the crossing.
- Tandem axle groups (rigid trucks, tractors, towed implements, most farm deliveries): 16T cattle grid.
- Triaxle groups (semi-trailers, B-doubles, livestock and grain transport, council and mine roads, feedlots): 20T cattle grid.
Two things should push you up a rating. The first is speed. A grid on a through road where traffic will not slow down takes far more dynamic load than one at a homestead gate where vehicles roll across at walking pace. The second is a change of land use. A grid on a lightly used block can end up carrying B-doubles once the land changes hands, is subdivided, or starts hosting a quarry, solar farm or feedlot. Replacing a failed grid means excavation, closing the crossing and another lift, so the extra cost of the next rating up is usually the cheaper option.
Size the width to the widest machine, and tie in the fence
The grid needs to cover the full formed width of the road, plus enough margin that the widest machine using it does not put its wheels on the edge or shoulder. Measure the widest machine that will use the crossing.
Conron Stockie cattle grids are available in 3.5 m and 4 m lengths for single-lane tracks, and a 7 m 20T model for two-lane roads and wide access points. Need something wider? We can build to any width in multiples of 3.5 m or 5 m, in 8T, 16T or 20T ratings. Talk to Conron about the options before you settle on a layout.
The grid only works if stock cannot go around it. Wing rails or fencing at each end need to close the gap to the fence line tightly. Cattle will test the ends of a grid long before they test the middle, and a loose wing or a strainer post set too far back will undo the best-specified grid. Our entire grid range has optional heavy-duty cattle rail wings for this.
Get the site right: ground, drainage and approaches
Bearing capacity
The abutments transfer every wheel load straight into the ground, so differential settlement is the failure to design out. Reactive clays, black soils, uncompacted fill and anything that stays wet for long periods are the main risks. If one abutment drops even slightly, the grid rocks under load, the rails start working against their seats and the approaches break up. On doubtful ground, a geotechnical check or a properly compacted crushed-rock base is cheap insurance.
Drainage and silting
A pit is a low point, and water runoff will find it if the grid is placed in a poor position. Water carries sediment into the pit and softens the ground under the abutments. Over time, the silt, gravel and manure that build up in the pit give stock solid footing between the rails.
Where possible, put the grid on level ground or a slight rise rather than in a dip, floodway or table-drain crossing. Keep the table drains running past the grid, and make sure the pit can drain or be cleaned out easily.
Approaches
Approaches should meet the grid at the same level, with a compacted, well-drained pavement for several metres on each side. A step between the approach and the grid means every wheel drops onto the abutment edge instead of rolling across. That impact loading is what breaks up gravel approaches and chips abutment edges, and it gets worse as the hole deepens. On unsealed roads, budget for topping up the approaches regularly.
Installation access
Our grids are heavy, from 2.4T to 5.2T fully assembled, so plan the lift before delivery day. Check the size of excavator or crane truck needed, whether it can get to the site in wet conditions, and whether there are overhead powerlines near the crossing.
Know what the council will ask for
On private land away from public roads, approval is generally not needed. However, producers carry full responsibility for the grid being safe and fit for the traffic using it, including visitors and contractors.
A grid on a public road, including an unsealed council road running through or along your property, needs consent from the road authority before work starts. That is usually your local council, or the state road agency for state roads. In NSW, for example, works on a public road require approval under section 138 of the Roads Act 1993. Conditions commonly cover the load rating and design standard, width, warning signage, wings and fencing, and ongoing maintenance. In many cases, the landholder who applied for the grid remains responsible for maintaining it.
It is wise to get the council’s requirements in writing before ordering, because their specification may decide the rating and length for you.
Budget for maintenance
A well-installed grid needs little attention, but it does need some. Clean out the pit on a set schedule and after any significant rain. Check that both abutments are still level and that the grid does not rock under load. Inspect the wings and fence tie-ins, and keep the approaches level with the grid. Most grid problems show up first at the approaches, so they are the best early warning.
Which Conron Stockie should I choose?
Conron’s Stockie 8T, 16T and 20T cattle grids are designed and manufactured in accordance with AS 5100.2. All three use hot-dipped galvanised steel and abutments made from 45 MPa batched concrete with synthetic fibres and steel reinforcement. The difference between them is mass.
8T Stockie
- Rated for: single axle group or below
- Typical use: homestead entries and driveways used only by light vehicles
- Size (L x W x H) and weight: 4000 x 2250 x 500 mm, 2650 kg
16T Stockie
- Rated for: tandem axle group or below
- Typical use: farm laneways and access tracks carrying rigid trucks, tractors and towed machinery
- Sizes (L x W x H) and weight: 3500 x 2250 x 500 mm, 2400 kg; 4000 x 2250 x 500 mm, 2700 kg
20T Stockie
- Rated for: triaxle groups
- Typical use: public and council roads, mine access, feedlots and any crossing used by semi-trailers or B-doubles
- Sizes (L x W x H) and weight: 3500 x 2250 x 500 mm, 2600 kg; 4000 x 2250 x 500 mm, 2950 kg; 7000 x 2250 x 500 mm, 5200 kg
For most working farms, the 16T is the practical choice. The 20T is the default for anything the public uses, any crossing carrying triaxle groups, or any farm crossing used by heavy trucks.
Before you order: a checklist
- What is the heaviest axle group likely to cross the grid over its life, and how fast will it be travelling?
- How wide is the formed track, and how wide is the widest machine that will use it?
- Is the crossing on a public road? If so, do you have the council’s requirements in writing?
- What is the ground like, and does the site hold water or sit in a natural drainage line?
- How will the wings tie into the existing fence, and is a side gate needed?
- Can the delivery truck and lifting equipment get to the site, and are there overhead powerlines?
- Who will clean the pit and maintain the approaches, and how often?
If you have the answers to these questions, the Conron team can confirm the right Stockie Cattle Grid for your crossing. Call 1300 084 698 or email sales@conron.com.au.